Your review 0 / 24 reviewed Pre-purchase gate Hold
VOLTCHINA
China Humanoid Robot Buyer Checklist 2026
Buyer-Side Procurement Tool

Buyer Checklist 2026

What Labs and R&D Teams Should Verify Before Buying a Chinese Humanoid Robot

University Labs Embodied-AI & R&D Technical Procurement
Edition
Public Research Edition
Sources Reviewed
10 September 2026
Pages
10 Sections
VoltChina · Buyer-side procurement tool Cover
VOLTCHINA
China Humanoid Robot Buyer Checklist 2026
A Procurement Working Paper

How to Use This Checklist

Purpose & Evidence Labels

Use it to compare quotations, request missing evidence, and record the questions that must be resolved before a purchase order. The goal is not to find the “best robot” — it is to make the quoted configuration, software access, delivery and support specific enough to approve or hold.

Start With the Experiment

What must your team be able to do on the delivered robot in its first month?

Four-Step Workflow

  1. Write down the exact robot, configuration and software versions being quoted.
  2. Mark each requirement Must-have, Preferred or N/A. Explain any N/A.
  3. Save the supporting document, version, date and responsible person.
  4. Tick a box only when the requirement is resolved for your order.

Evidence Labels

Manufacturer-Confirmed

A traceable written answer for the exact configuration and intended use.

Publicly Documented

An identifiable public source describes the feature; it may cover another configuration or release.

Needs Direct Confirmation

Evidence is missing, incomplete or not yet matched to this order.

Scope Note

Public research edition. Order-specific manufacturer confirmations and physical platform testing are outside this checklist.

VoltChina · Buyer-side procurement tool · Sources reviewed 10 September 2026 Page 2 / 10
VOLTCHINA
Procurement Checklist
Procurement Checklist

Part IConfiguration & Software Access

24 Verification Items Across Six Categories

1Configuration and Control Access

01
Evidence, version or open question
02
Evidence, version or open question
03
Evidence, version or open question
04
Evidence, version or open question

2SDK, ROS and Simulation

05
Evidence, version or open question
06
Evidence, version or open question
07
Evidence, version or open question
08
Evidence, version or open question
Important

An imported robot model is only one part of a working simulation workflow. An Isaac Gym example does not establish Isaac Sim or Isaac Lab compatibility.

VoltChina · Buyer-side procurement tool · Sources reviewed 10 September 2026 Page 3 / 10
VOLTCHINA
Procurement Checklist
Procurement Checklist

Part IIData, Hardware & Task Fit

VLA, Teleoperation, Sensors & Runtime

3VLA, Teleoperation and Data

09
Evidence, version or open question
10
Evidence, version or open question
11
Evidence, version or open question
12
Evidence, version or open question

4Hardware and Task Performance

13
Evidence, version or open question
14
Evidence, version or open question
15
Evidence, version or open question
16
Evidence, version or open question
VoltChina · Buyer-side procurement tool · Sources reviewed 10 September 2026 Page 4 / 10
VOLTCHINA
Procurement Checklist
Procurement Checklist

Part IIISafety, Delivery & Support

Ownership, Cost, Warranty & Clearance

5Safety, Software and Ownership

17
Evidence, version or open question
18
Evidence, version or open question
19
Evidence, version or open question
20
Evidence, version or open question

6Cost, Delivery and Support

21
Evidence, version or open question
22
Evidence, version or open question
23
Evidence, version or open question
24
Evidence, version or open question
For Each Compatibility Claim

Record the robot SKU, hardware revision, joints and hands, firmware, SDK or repository version, OS or ROS release, simulator version, use case, source and date.

VoltChina · Buyer-side procurement tool · Sources reviewed 10 September 2026 Page 5 / 10
VOLTCHINA
Pre-Purchase Gate
Pre-Purchase Gate

Do Not Issue the PO Until These 10 Items Are Confirmed

Hold Rule & Decision Gate

Hold Rule

For each item, record a document reference, owner and date. A required unresolved item means Hold. A formally approved deviation remains a deviation; it is not a verified capability.

01
02
03
04
05
06
07
08
09
10
Decision
Decision Owner and Date
Outstanding Requirement / Consequence / Action Owner / Due Date
VoltChina · Buyer-side procurement tool · Sources reviewed 10 September 2026 Page 6 / 10
VOLTCHINA
Buyer Requirements Worksheet — A
Buyer Requirements Worksheet — A

Project and Purchase

Turn General Interest Into a Reviewable Brief

Purpose

Turn general interest into a requirements brief that technical and procurement teams can actually review.

Organisation or Lab
Technical Contact / Role / Work Email
Procurement Decision-Maker or Approval Process
Primary Use
First Experiment and Measurable Success Criteria
Required Form
Shortlisted Manufacturer / Model / Configuration
Quantity Now / Possible Expansion
Budget Amount / Currency
Budget Basis
Included in Budget
Budget Reserved for First Three Years of Support and Operation
Funding Status or Constraints
Delivery Country / City / Facility
Importer or Logistics Owner, if Known
VoltChina · Buyer-side procurement tool · Sources reviewed 10 September 2026 Page 7 / 10
VOLTCHINA
Buyer Requirements Worksheet — B
Buyer Requirements Worksheet — B

Technical Fit and Integration

Stack, Interfaces, Skills & Acceptance Criteria

Operating System + Version / ROS Distribution / Middleware
Simulator + Version
Languages / Frameworks / Target Models / Data Format
Existing Workstation or GPU Resources
Control Access Required
Hands / End Effectors / Tactile Requirements
Object Mass / Reach / Posture / Task Speed
Sensors / External Interfaces / Data Rates
Runtime Target and Task Cycle
Team Skills
Integration Team Size / Available Person-Weeks
Work the Supplier Must Complete Before Handover
Task Fit

Write acceptance criteria as: task + quoted configuration + test conditions + data to retain + pass/fail result. Avoid a stand-alone claim such as “supports ROS 2”.

VoltChina · Buyer-side procurement tool · Sources reviewed 10 September 2026 Page 8 / 10
VOLTCHINA
Buyer Requirements Worksheet — C/D
Buyer Requirements Worksheet — C/D

Support, Constraints and Timing

Training, Repairs, Network, Deadlines & Decisive Requirements

Training Language / Participants / Preferred Format
Support Location / Time Zone
Maximum Acceptable Downtime
Repair Needs
Safety / Facility / IT Contact
Network Restrictions
Tender / Funding / Import / Procurement Restrictions
Target Selection Date / PO Date
Required Arrival Date / First Experiment
Hard Deadline and Consequence of Delay

Three Requirements That Decide This Purchase

1.
2.
3.
VoltChina · Buyer-side procurement tool · Sources reviewed 10 September 2026 Page 9 / 10
VOLTCHINA
Evidence Capture
Evidence Capture

Supplier Answer Record

One Record Per Material Supplier Answer

Copy This Page

Use one record per material supplier answer. A distributor response is not automatically manufacturer-confirmed.

Question or Requirement
Exact Configuration and Hardware or Software Version
Supplier Answer and Limitations
Source Link or Attached Document / Version / Date
Manufacturer or Seller Contact / Organisation / Role
Demonstration or Test Conditions and Result
Open Issue / Impact / Next Action / Owner / Due Date
Evidence Classification
Evidence Hygiene

Attach the quotation, manual, support email or test log to the reference above. Preserve the exact hardware configuration and software version in every supplier answer.

VoltChina · Buyer-side procurement tool · Sources reviewed 10 September 2026 Page 10 / 10
VOLTCHINA
Research Notes
Research Notes

Sources and Next Step

Selected Source Material & Scope

Public sources were reviewed on 10 September 2026. Product pages, terms and code repositories can change. Reconfirm time-sensitive specifications, support terms and applicable rules for the actual purchase.

Selected Source Material

SourceUse in This Checklist
Unitree G1 configuration tableConfiguration, research access and warranty table
Unitree after-sales termsWarranty scope and development-related exclusions
Unitree Isaac Lab examplesModel and end-effector-specific examples
LimX TRON 2 SDK guideHigh and low-level interface documentation
Fourier GR-1 training guideSeparate Isaac Gym and MuJoCo references
Galaxea R1 ROS 2 guideConfiguration-specific software interfaces
ROKAE product catalogueDistinguishes complete platforms and arm products
Scope

This checklist supports requirements gathering and evidence capture. It does not replace your institution’s technical, safety, legal or procurement approval.

Turn Your Shortlist Into a Verification Plan

Evaluating a Chinese robot for your lab or R&D team?

Share your intended use, shortlisted configuration and the questions you cannot yet resolve.

Submit requirements at voltchina.net/robotics